Sùliào biānzhī dài tú mó cāozuò xìjié èrshí tiáo 1, zài shàng juǎn bù qián jǐn kěnéng duì zhǔn jiāo gǔn zhōngjiān. 2, Biānzhī dài juǎn liào jìn chē zhīqián, guī jiāo gǔn liǎng duān tú hǎo guīyóu. 3, Jiē bù, xià bù shí, tóngbù chēsù jiàng wèi xiǎoyú 30 mǐ/

Date:2022-05-22 Click:0

1. Align the middle of the rubber roller as much as possible before winding the cloth.

2. Before the woven bag roll material enters the car, both ends of the silicone roller are coated with silicone oil.

3. When the cloth is connected and placed, the synchronous speed is reduced to less than 30 m/min.

4. Pinch the roller before connecting the cloth, and don't forget to stick the tape. After the cloth is connected, look at the edge of the cloth and align the polarization correction photoelectric eye, and then lift the nip roller.

5. When new cloth is connected, the width of the cloth will change. It is necessary to observe the cloth edge and adjust the die edge.

6. The speed of the vehicle is slightly slower before the cloth is connected; after the cloth is connected, before the double-layer joint enters the corona, turn off the corona machine.

7. After the double-layer joint enters the composite roller, lift the trimming knife and turn on the blower. After the joint is finished, the edges are trimmed and closed.

8. When the joint reaches the winding, change the volume in time.

9. Drive by the front shift, and adjust the trimming width as soon as possible before you finish drawing and picking up new fabrics. Adjust the feeding, winding tension, preheating roll temperature, corona voltage, and coating speed ratio. After walking, pick up the new cloth.

10. The temperature of the cold roll is low, and the speed should not be higher than 35 m/min. Before starting the machine, turn off the water inlet of the cooling roller, wait for the surface of the cooling roller to have a temperature, and then open the cooling water valve. Control the surface temperature of the cooling roll (40~50 degrees Celsius).

11. Adjust the tension of unwinding and rewinding to avoid bell mouth when rewinding.

12. When there is a waste cloth, touch the bell twice. The winding is marked with a strip of paper to remind the subsequent process.

Including missing coating, blistering, diaphragm split, broken edge and other defective and waste products, must be marked.

13. If the flatness of the woven fabric is poor, and the lotus leaf appears, the tension of the feeding should be increased.

14. Before rolling the cloth, first confirm the length and shortness of the end face of the cloth roll and the core iron pipe; after the cloth is rolled, observe the position of the cloth roll, and try to be in the middle of the rubber roller. If the offset is too much in the middle, you should roll down and turn around in time. To prevent it from being rectified because the rectification stroke is already in place.

15. During the film coating process, if the car is withdrawn for any reason, the corona machine, the preheating and cooling roller water valves should be closed in time. Open them one by one after entering the car.

16. If the woven fabric has serious ruffles, do not put it on the operating surface to correct the deviation, and appropriately increase the unwinding tension.

17. After the diameter of the cloth roll is reduced, the tension (if it is manual) should be released.

18. When changing specifications, the surface of the rubber roller and the pressure roller should be decontaminated first.

19. Before pouring the coating material into the mixer, clean the dust on the outer skin of the packaging bag. During the mixing process, the paint should be kept clean to prevent dust from entering the hopper.

20. Regularly fill the air source triplet with oil, and daily drip oil for the friction wheel and pneumatic track.